Elevator Installation Old
Elevators/Escalators In Lebanon
The installation of elevators and escalators is not an easy task. You require a professional team to do so for proper and safe working. Depending on the quality and reliability of the installation, they can last as long as possible. That's why it becomes necessary to take these services from the experts.
As you are here, we will provide complete details about our installation in this article, including how we work and which types of installation services you can find at Ecolift.
Professional Lift Installation
Ecolift is propelled by an ambitious vision to emerge as the preeminent force in vertical transportation solutions, exercising unparalleled dominance in both local and regional marketplaces.
Installation Services?
It’s important to understand the root cause of problems that require urgent attention and care. Once our professionals inspect the root cause, they ensure the maintenance of each required component and structural material that makes them work smoothly.
Experienced Technicians
Ecolift has a team of experienced and professional technicians who can handle and deal with any type and model of elevators to install, whether in commercial, residential, or any building.
Commitment to Safety and Quality
We offer reliable, quality work. After installation, we check it thoroughly for safety concerns. The installations are completed by prioritizing all risk and security factors.
Customized Solutions
If you are looking for customized solutions and installation, you are at the right place. We offer customized solutions for the installation of customized elevators/escalators
Customer Support and After Service
Right after the installation, you can also contact and seek aftercare advice. Our customer support service is actively available 24/7 for any queries.
Elevator Installation Services in Lebanon
Installing an elevator is a structural project as much as a mechanical one.
Shaft dimensions, pit depth, headroom, electrical supply, and the building's daily traffic all decide which system will actually work and installing it wrong is expensive to undo. Ecolift has been surveying, engineering, and installing lifts in Lebanon for more than 50 years, using our own site engineers and technicians rather than subcontracted crews, so the team that measures your shaft is the same team that commissions the finished lift.
Below is exactly how an installation runs from first call to handover, which lift types we install, and what to check before you sign a contract with anyone.
50+ Years in Lebanon
EN 81-20 & EN 81-50 Tested
In-house Engineers Only
How Installation Works, Step by Step
Step 01 – Free site survey and feasibility check
Before we quote anything, an engineer visits the site to measure available shaft or pit space, headroom, existing structural openings, and electrical capacity. In older Beirut buildings that were never built with a shaft, this step decides whether a self-supporting structure or a machine-room-less (MRL) unit can be retrofitted without major demolition.
Step 02 – Engineering and system selection
We calculate expected passenger or load traffic (critical for offices, clinics, and residential towers with peak-hour queuing) and match it against travel height, available pit depth, and power supply to recommend traction, hydraulic, or MRL and explain the trade-offs in cost, speed, and space rather than defaulting to one system.
Step 03 – Permit and approval coordination
Elevator installations in Lebanon typically require sign-off from the relevant municipal and civil defense authorities before the lift is put into service. We prepare the technical documentation your project needs for that approval process; your architect or contractor should confirm the specific requirements that apply to your building and district.
Step 04 – Procurement and component staging
Because we stock common components and spare parts locally in Beirut, standard installations aren't held up waiting on customs clearance for routine parts. Only genuinely custom cabin finishes or non-standard equipment require longer lead times, and we'll tell you upfront if that applies to your job.
Step 05 – Installation and commissioning
Our own technicians handle rail alignment, cabin fitting, wiring, and control system commissioning on-site. A straightforward residential or low-rise passenger installation typically runs a few weeks from delivery of equipment to handover; high-rise, heavy-duty goods lifts, or projects requiring shaft construction take longer. We'll give you a project-specific timeline in writing before work starts, not a generic estimate.
Step 06 – Testing, certification, and handover
Every lift is load-tested and checked against EN 81-20 (Safety rules for the construction and installation of new lifts) and EN 81-50 (Testing and examination of lift components) before we sign it off, including the emergency alarm and communication system. You get commissioning documentation, a warranty on the installation, and a walkthrough of the controls and emergency procedures with your building staff.
Elevator and Lift Types We Install
Passenger and commercial elevators
Traffic-calculated systems for offices, hospitals, and multi-tenant buildings where downtime isn't an option sized to actual peak-hour demand rather than a standard default cab.
Home and residential elevators
Compact traction or MRL units that fit into existing villas and apartments, often without a dedicated machine room, for households where stairs have become a barrier for elderly parents or family members with reduced mobility.
Goods and vehicle elevators
Reinforced cabins and higher load ratings for warehouses, retail back-of-house, and multi-level parking, engineered around the actual weights and dimensions they'll carry daily rather than a passenger-lift frame adapted after the fact.
Escalators and moving walkways
For malls, airports, and hospitals with continuous foot traffic installed with anti-slip steps, emergency braking, and step-gap sensors to European safety standards.
Accessibility lifts
Inclined platform lifts for staircases that can't be widened, indoor stair lifts, and wheelchair platform lifts for buildings retrofitting for accessibility compliance.
Dumbwaiters and automatic doors
Small-format lifts for restaurants, laundries, and offices moving goods between floors, plus sliding and revolving entrance doors often specified alongside a new lobby elevator.
Why Building Owners in Lebanon Choose Ecolift for Installation
In-house crews only
Our own engineers and technicians handle survey, installation, and later maintenance - no subcontracted labor changing hands between stages.
Spare parts stocked in Beirut
Common components are on hand locally, so routine installs and future servicing aren't dependent on shipping delays.
24/7 line, not just during installation
The same emergency contact that answers during your project keeps answering after handover.
Written, project-specific timelines and quotes
You get a proposal based on your building's actual survey, not a template price.
Independent testing before handover
Load testing and safety checks are documented and signed off before you take delivery, not left implicit.
Whenever an issue arises the service team is fast to arrive and fix the issue at any branch all over Lebanon
I personally enjoy their services and the way they go out of their way to gain customer satisfaction
After working with Ecolift and the elevators installation they have completed for our facilities, we could feel the difference between the previously installed elevators and the new lifts system Ecolift has installed. The professionalism and quality in every step is assured
I like Ecolift's team constant quick response and elegant communication
In the lifts business we tried out many companies to maintain our elevators, Ecolift never disappointed
The best elevators company in Lebanon related to service, readiness and response time
My building is crowded and the elevators cannot stop for 1 minute. ever since i signed with Ecolift for maintenance i never have to worry about any malfunction or delay in any block
Do You Like Ecolift? Share With Your Friends!
Will be used in accordance with our Privacy Policy
Contact Us
FAQs
It depends on the system and the building. A standard passenger or home elevator in a building with an existing shaft typically takes a few weeks from equipment delivery to commissioning. Projects that require constructing a new shaft, or high-rise and heavy-duty goods lifts, take longer. You'll receive a timeline specific to your site after the survey, not a generic figure.
Often, yes. Machine-room-less (MRL) systems and self-supporting shaft structures are commonly used to retrofit elevators into older Beirut buildings without a pre-existing lift well. Whether it's feasible for your specific building depends on available floor space, ceiling heights, and structural load points which is exactly what the free site survey is for.
It comes down to travel height, available pit depth, power supply, and budget. Hydraulic systems generally suit lower-rise buildings with limited pit depth; traction and MRL systems handle greater heights more efficiently and use less energy over time. We walk through the trade-offs for your specific building rather than defaulting to one system.
Generally yes new lift installations require sign-off from the relevant municipal and civil defense authorities before the lift can be put into service. We prepare the technical documentation for that process; confirm the exact requirements for your district with your architect, contractor, or the municipality, since procedures can vary by location.
Cost depends on lift type, load capacity, travel height, whether a shaft already exists, and cabin finish. We don't quote sight unseen pricing follows the free site survey so the number reflects your building, not an average.
Installation and ongoing maintenance are separate services. We offer maintenance contracts once your lift is commissioned, and because our own team installed it, they already know the system when a service call comes in.